Joplin, MO
Work Completed:
- Electrical
Overview:
Byers was hired to complete the Electrical install for a Krones Turn Key Bottling Line at a Beverage Facility in Joplin, MO. For this project Byers fabricated and install all Cable Tray supports, handled and installed all manufacturer control panels, installed all over head and conveyor cable tray, pulled all the Power Distribution to the equipment, pulled all the power and controls from the control cabinets and boxes to the required devices, and terminated all wiring in the panels and the field. This project was completed on time with a reduced schedule from a 40 day install to a 35 day install.