West Deptford, NJ
Work Completed:
- Electrical & Mechanical
Overview:
Byers Industrial was contracted both electrically and mechanically to install a retrofitted distillation unit, while tying into existing utilities and process lines. Mechanically, Byers welded and installed various pipe materials including stainless steel and carbon, valves, fittings, supports, as well as the installation of a small heat exchanger.
Electrically, Byers installed conduit, wire, transmitters, switches for a few different motors, as well as ethernet and fiber cable. We also installed (2) Koch panels, purge panels, and provided all terminations necessary.