Beverage Distribution Facility, Lehigh PA
In Lehigh, Pennsylvania, Byers executed an integrated electrical and mechanical program to stand up a large-scale beverage distribution operation. The engagement began with careful coordination around active logistics, sequencing demolition and new installs to minimize disruption while preparing the site for a modern high-throughput conveyance and packaging system.
Scope included demo of legacy equipment followed by unloading and installing more than two dozen truckloads of new systems: structural steel, decking and railing, case conveyors with inlines and declines, buffer lanes, flow racks, palletizers, a stretch wrapper, and air tubing. Byers set and installed every component and provided the necessary power to bring the entire line into service as a cohesive, code-compliant operation.
The result is a streamlined, durable material-handling platform designed for reliability, safety, and ease of maintenance—supporting faster order fulfillment and scalable growth across distribution activities. By delivering both the mechanical assemblies and the electrical infrastructure, Byers provided a single-point solution that accelerates commissioning and long-term performance