August 27, 2025

Beverage Bottling Facility – Billings, MT

For a beverage production facility’s Line 2 expansion, Byers delivered the turnkey electrical installation to support high-throughput bottling and packaging. The team coordinated layout, sequencing, and safety around active operations, establishing a clean, code-compliant backbone for power distribution, controls, networking, and device safety—ready to integrate with existing plant systems.

Scope included fabricating and installing cable-tray supports; setting and tying in control panels and local disconnects; routing feeders and branch circuits; installing overhead and conveyor tray; and pulling power, control, and network cabling from cabinets and junction boxes to all field devices. Byers completed terminations in panels and at the equipment, integrated e-stops and operator stations, and provided labeling and documentation to unify the line as a cohesive, maintainable system.

Execution emphasized disciplined staging, safe rigging, precise mounting, and clear separation of voltages for reliability and serviceability. The team supported start-up with I/O checks, device verification, and as-built updates—delivering an electrical installation that enables efficient commissioning, rapid troubleshooting, and long-term performance for the upgraded production line.

View The Rest Of The Gallery For: Beverage Bottling Facility – Billings, MT and contact us today to start your project

Rob Sebia

Chief Executive Officer

“We favorably impact people, families and communities with our work, our projects and our charitable efforts. It’s an exciting place to be every day and our opportunities to contribute will grow as we continue to grow around the United States.”