Bakery Manufacturing Facility – Salt Lake City, UT
At a bakery manufacturing facility in Salt Lake City, Utah, Byers proposed the complete building electrical package to support production and utilities, coordinating installation with an owner-led milestone schedule. The scope spans building lighting and power alongside process and wastewater building electrical, with work sequenced to maintain safety, quality, and on-time turnover.
Core deliverables include power distribution; building and HVAC equipment feeders and receptacles; fire alarm and low-voltage systems; process equipment power and rough-in; and WWTP/WWTF building electrical. Material and equipment logistics cover distribution panels/panelboards/submains, switchboards, and emergency-generator coordination, with arc-flash data collection and reporting preceding start-up. Commissioning support includes pre-energization checks, system testing, documentation updates, and training/turnover per specifications.
Execution aligns with project specifications and owner standards: testing and inspection per spec;-defined exclusions and clarifications for telecom/IT interfaces (e.g., MDF/IDF cabinet supply with internal components by others; WAP devices by others); and safety, insurance, and workforce qualifications documented in the submittal. Clarifications also note conduit/routing conventions and allowances for required studies (e.g., ERRCS/FA vendor coordination), ensuring a clean, maintainable installation and streamlined commissioning.