August 27, 2025

Beverage Bottling Facility, Greer SC

In Greer, South Carolina, Byers delivered the full electrical installation for a Krones turnkey bottling line, coordinating closely with OEM requirements to ensure a clean, maintainable layout and on-schedule commissioning. The scope emphasized safe sequencing around active construction and precise integration of power and controls to support high-throughput packaging operations.

Work included fabricating and installing all cable-tray supports; handling and setting all manufacturer control panels; installing overhead and conveyor cable tray; pulling power distribution to process equipment; running power and control wiring from control cabinets and junction boxes to all field devices; and completing terminations both in the panels and throughout the line. The result is a cohesive, code-compliant electrical backbone that ties every subsystem into a unified control architecture.

By delivering a turnkey electrical package—from supports and tray to distribution, controls, and terminations—Byers positioned the facility for reliable operation, efficient troubleshooting, and streamlined maintenance. The finished installation aligns with Krones’ specifications and plant standards, enabling rapid ramp-up and long-term performance for the bottling operation.

View The Rest Of The Gallery For: Beverage Bottling Facility, Greer SC and contact us today to start your project

Rob Sebia

Chief Executive Officer

“We favorably impact people, families and communities with our work, our projects and our charitable efforts. It’s an exciting place to be every day and our opportunities to contribute will grow as we continue to grow around the United States.”