Byers delivered the electrical buildout for a large-scale EV charging installation, furnishing labor, materials, and equipment to implement the system per issued drawings. Work planning emphasized clean, code-compliant layouts; coordinated sequencing with parallel trades; and weekday/Saturday 10-hour shifts to maintain schedule and safety throughout installation.

Scope included receiving and installing medium-voltage main switchgear; two step-down transformers; multiple 480-V switchboards (including 1200-A, 2000-A, and 3000-A units); secondary transformers (eight 225-kVA and one 300-kVA); additional 800-A and 1200-A switchboards; and 160 EV chargers mounted on posts (two chargers per post), along with 53 junction boxes at charger locations

Execution incorporated trenching for new/extended underground conduits (Schedule 40 PVC), assumptions and allowances for clearing existing conduits, XHHW copper feeders and aluminum charger circuits, and a medium-voltage hi-pot test. Delineations clarified that equipment (panels/transformers/switchgear/chargers) was furnished by others; no concrete pads or bollards were included; and certain site items (permits, private locates, saw-cutting/asphalt/concrete) were by others—while Byers handled unloading/setting when installation was immediately feasible.

View The Rest Of The Gallery For: EV Charging Infrastructure – Irondale, AL and contact us today to start your project

Rob Sebia

Chief Executive Officer

“We favorably impact people, families and communities with our work, our projects and our charitable efforts. It’s an exciting place to be every day and our opportunities to contribute will grow as we continue to grow around the United States.”